The project includes pedestrian and bike accommodations along East Main Street/Route 20 from Meadow Street to Delmont Avenue. This mostly State owned corridor was identified by MassDOT as a priority in their recent Statewide Pedestrian Plan and Statewide Bicycle Plan. The project, both design and construction, will be fully funded by MassDOT. MassDOT completed the 25% Design Plans in May of 2021 and will discussing the plans at an upcoming Design Public Hearing. We will continue to post project updates on the Engineering Department website. A construction schedule has not yet been identified.
The 25% Drawings are available for review here: 25% Design Plans